top of page
  • Instagram
  • LinkedIn Social Icon
Oyster Point Ph2
Oyster Point Ph2 IP (1)
OYSTER PT PH2 (84)
Oyster Point Ph2 IP (57)
Oyster Point Ph2 IP (19)
Oyster Point Ph2 IP (38)
Oyster Point Ph2 IP (25)
Oyster Point Ph2 IP (4)
Oyster Point Ph2 IP (13)
Oyster Point Ph2 IP (17)

Oyster Point Phase 2

Owner:

Kilroy

​

Landscape Architect:

Field Operations


General Contractor:

Hathaway Dinwiddie

Our latest office campus project in South San Francisco, Phase 2 of the Oyster Point campus, features an innovative design by Field Operations. The project showcases multiple unique design moments and spaces, with never-before-seen finishes and construction techniques for both walls and flatwork. The campus includes surface seeded shells, ground finish paving, engravings, inlaid stone and angled wall joints, all complemented by custom integral color.

© 2025 Shaw & Sons Concrete Contractors

bottom of page